Pattern of Assistance                                              For more information, Please go through implementation Guidelines

  INFRASTRUCTURE PROPOSED FOR DEVELOPMENT OF SMALL NURSERY     
           
 SI.No Name of the component Estimated Cost Subsidy allowed 100% under public sector                          (Rs. in lakhs) Subsidy allowed 50% under private sector  (Rs. in lakhs)  
(Rs. in lakhs)  
1 Establishment of scion block (1.50 Acr) required crop wise, variety wise plant material will be procured from Research Station only. 2 2 1  
2 Installation of drip irrigation for new scion blocks / existing scion block or orchards 0.6 0.6 0.3  
3 Digging of bore well (Depth in meters) & Purchase of submersible pump 2 2 1  
4 Erection of shade net 500 sq.mt @ Rs. 710 per sq. mt. 3.55 3.55 1.78  
5 Vermicompost unit  0.6 0.6 0.3  
6 Electrification of farm to the extent required 2 2 1  
7 Land preparation if required 2 2 1  
8 Construction of store room 2.25 2.25 1.13  
  Total: 15 15 7.5  
           
  INFRASTRUCTURE PROPOSED FOR F UPGRADING NURSERY INFRASTRUCTURE TO MEET ACCREDITATION NORMS    
           
SI.No Name of the component Estimated Cost Subsidy allowed 100% under public sector  (Rs. in lakhs) Subsidy allowed 50% under private sector  (Rs. in lakhs)  
(Rs. in lakhs)  
1 Hot bed sterilization of media 1 1 0.5  
2 Working shed 10x10x10 feet 1.4 1.4 0.7  
3 Virus indexing facility 1 1 0.5  
4 Hardening chamber 1 1 0.5  
5 Mist chamber 0.5 0.5 0.25  
6 Establishment of scion block (1.50 Acre) required crop wise, variety wise plant material will be procured from Research Station only. 2 2 1  
7 Installation of drip irrigation for new scion block or orchards and fertigation 0.6 0.6 0.3  
8 Water Harvesting system for storage of water in 20mx20mx3m ponds/tube wells/dug wells @ Rs.100 cubic meters / Water Storage tank (Capacity 2.0 lakhs litre capacity)  1.5 1.5 0.75  
9 Fencing if required  1 1 0.5  
Total: 10 10 5  
           
  ESTABLISHMENT OF TISSUE CULTURE UNITS    
           
  i) Strengthening of existing Tissue Culture (TC) units  Total Unit Cost: Rs. 20.00 lakh /unit       
           
  ii) Setting up of new TC Units.  Total Unit Cost: Rs. 250.00 lakh/unit       
           
           
  ESTABLISHMENT OF SEED INFRASTRUCTURE    
           
  i) Seed infrastructure  Total Unit Cost: Rs. 200.00 lakh       
           
           
  ESTABLISHMENT OF NEW GARDENS    
           
  Item Max. permissible cost Pattern of Assistance    
  Establishment of new gardens (Area Expansion)  
  1) Fruits      
  A) Cost intensive crops (for a maximum area of 4 ha per beneficiary)  
  Banana (TC) Integrated package with drip irrigation.  Rs. 3.00 lakh/ha  Maximum of Rs. 1.20 lakh/ha (40 % of cost) for meeting the expenditure on planting material and cost of material for drip system, INM/IPM etc., in 2 installments (75:25).     
   
   
  Papaya Integrated package with drip irrigation.   Rs. 2.00 lakh/ha.  Maximum of Rs. 0.80 lakh/ha (40% of the cost) for meeting expenditure on planting material, drip irrigation and cost of material for INM/IPM, in 2 installments (75:25).     
   
   
  Ultra high density Guava Integrated package with drip irrigation   Rs. 2.00 lakh/ha.  Maximum of Rs. 0.80 lakh/ ha. (40% of cost) for meeting the expenditure on planting material and cost of material for drip system, INM/IPM, and canopy management in 3 installments of 60:20:20 subject to survival rate of 75% in 2nd year and 90% in 3rd year).     
   
   
  High density planting (mango, pomegranate etc) Integrated package with drip irrigation   Rs. 1.50 lakh /ha  Maximum of Rs. 0.60 lakh per ha. (40% of cost) for meeting the expenditure on planting material, cost of drip system INM/IPM, canopy management etc., in 3 installments of 60:20:20 subject to survival rate of 75% in 2nd year and 90% in 3rd year).     
   
  B) Fruit crops other than cost intensive crops using normal spacing   
  Sweet Orange and Acid lime Integrated package with drip irrigation   Rs. 1.00 lakh/ha  Maximum of Rs. 0.40 lakh/ ha. (40% of cost) for meeting the expenditure on planting material, cost of drip system, INM/IPM, canopy management etc in 3 installments of 60:20:20 subject to survival rate of 75% in 2nd year & 90% in 3rd year for perennial crops and for non perennial crops in 2 installments of 75:25.     
           
  VEGETABLES    
           
Sl. No Item Max. permissible cost Pattern of Assistance    
1 Vegetables (For maximum area of 2 ha per beneficiary)     
  i) Hybrid Rs.50,000/ ha 40% of total cost.    
           
  FLOWERS        
           
Sl. No. Item Max. permissible cost Pattern of Assistance    
                        
1 Flowers (For a maximum of 2 ha per beneficiary)    
  i) Loose Flowers Rs. 40,000/ha 40 % of the cost for S&M farmers and 25% of cost to other category farmers in general areas.    
           
  2nd Year Maintenance    
           
S. No. Name of the crop Plant Material INM IPM Total Assistance 
1 2 3 4 5 6
1 Mango (5 x 5 Mtrs.)  1350 3600 2550 7500
2 Sweet Orange (5x5 Mtrs.) 1600 3850 2550 8000
3 Sweet Orange (6.3x6.3 Mtrs.) 1405 2325 1270 5000
4 Guava (2.5 x 2.5 Mtrs.)  5400 1253 1347 8000
5 Acid Lime (5x5 Mtrs.) 700 4175 2625 7500
6 Acid Lime (6.3x6.3 Mtrs.) 563 2700 1737 5000
7 Pomegranate (5x3 Mtrs.) 2000 3750 1750 7500
8 Banana 0 8588 1787 10375
9 Papaya 0 5363 2137 7500
10 Cocoa 218 1525 857 2600
           
  3rd Year Maintenance    
           
S. No. Name of the crop Plant Material INM IPM Total Assistance 
1 2 3 4 5 6
1 Mango (7.5 m x 7.5 m) 328 3422 1650 5400
2 Mango (5 x 5 m) 405 4875 2220 7500
3 UHDP Mango and Guava (2.5 x 2.5m) 2160 4340 1500 8000
4 Sweet Orange (5 m x 5 m) 480 5295 2225 8000
5 Sweet Orange (6.3m x 6.3m) 563 3037 1400 5000
6 Acid Lime (5 m x 5 m) 210 4915 2375 7500
7 Acid Lime (6.3 m x 6.3 m) 225 3075 1700 5000
8 Pomegranate 675 4750 2075 7500
9 Cocoa (3 m x 3 m) 88 1575 937 2600
           
  REJUVENATION AND CANOPY MANAGEMENT    
           
Sl. No. Item Max. permissible cost Pattern of Assistance    
1 Rejuvenation / replacement of senile plantation, canopy management Rs. 40,000/ha 50% of the total cost subject to a maximum of Rs. 20,000/ha limited to two ha per beneficiary.    
           
  INTEGRATED PEST MANAGEMENT / INTEGRATED NUTRIENT MANAGEMENT    
           
1 Assistance is limited to 30% cost, subject to a maximum of Rs. 1200/- per on the total cost of inputs to a max ceiling of 4 Ha per beneficiary.    
           
           
  PROTECTED CULTIVATION     
SI.No. Item Estimated unit cost Pattern of Assistance    
  a. Fan & Pad system      
    Rs.1650/Sqm (up to area 500 Sq.m) 50% of cost for a maximum area of 4000 sq.m per beneficiary.    
Rs.1465/Sq.m (>500 Sqm up to 1008 Sqm)    
Rs.1420/Sq.m (>2080 Sq.m up to 2080 Sqm)    
Rs.1400/Sq.m(>2080 Sq.m upto 4000 Sq.m)    
Above rates will be 15% higher for hilly areas.     
  b. Naturally ventilated system      
  i) Tubular structure i. Rs.1060/Sq.m (up to area 500 Sq. m) 50% of cost limited 4000 sq. m per beneficiary.    
ii.Rs. 935/Sq.m (>500 Sq. m up to 1008 Sq. m)    
iii.Rs. 890/Sq. m (>1008 Sqm up to 2080 Sq. m)    
iv.Rs. 844/Sq. m (>2080 Sq. m up to 4000 Sq. m)    
Above rate will be 15% higher for hilly areas     
  ii) Wooden structure Rs. 540/Sq. m and Rs. 621/Sq. m for hilly areas 50% of the cost limited to 20 units (each unit not to exceed 200 Sqm per beneficiary).    
   
2 Shade Net House       
  (a) Tubular structure With plastic top as addition: >4.00m height - Rs. 710/Sqm 50% of cost limited to 4000 Sq. m. per beneficiary.    
   
    Dome shape; >4.00 m height – Rs. 600/sqm 50% of cost limited to 4000 Sq. m. per beneficiary.    
   
    Flat shape-all GI; 4.0 m height – Rs. 550/sqm 50% of cost limited to 4000 Sq. m. per beneficiary.    
   
    Flat shape-Cable purlin, 4.0 m ht. – Rs. 525/sqm 50% of cost limited to 4000 Sq. m. per beneficiary.    
   
  (b) Wooden structure Rs. 492/Sqm and 50% of cost limited to 20 units (each unit not to exceed 200    
Rs. 566/Sqm for hilly areas Sq.m ) per beneficiary.    
       
       
3 Cost of planting material of high value vegetables grown in poly house Rs.140/Sq. m 50% of cost limited to 4000 Sq.m per beneficiary.    
   
4 Cost of planting material & cultivation of Orchid & Anthurium under poly house /shade net house. Rs. 700/Sqm 50% of cost limited to 4000 Sq. m per beneficiary.    
   
5 Cost of planting material & cultivation of Carnation & Gerbera under poly house/shade net house. Rs. 610/Sqm 50% of cost limited to 4000 Sq. m per beneficiary.    
   
6 Cost of planting material & cultivation of Rose and lilum under poly house/shade net house Rs. 426/Sqm 50% of cost limited to 4000 Sq. m per beneficiary    
   
7 Plastic Mulching Rs. 32,000/ha and Rs. 36,800/ha for hilly areas 50% of the total cost limited to 2 ha per beneficiary.    
           
           
  ORGANIC FARMING    
           
a)For adoption 50% assistance of Rs.10,000/- per Ha. over a period of three years i.e.,       
1 Year …. Rs.4,000/-       
2 Year …. Rs.3,000/-      
3 Year …. Rs.3,000/-      
           
a)For certification – Rs.5.00 lakhs for a cluster of 50 Ha. over a period of three years to meet the cost of documentation, training and internal control system  and certification charges i.e.,       
           
           
1 Year …. Rs.1.50 lakhs       
2 Year …. Rs.1.50 lakhs      
3 Year …. Rs.2.00 lakhs      
           
  VERMICOMPOST UNITS    
           
50% cost as assistance max. of Rs. 50,000 - per unit is provided on the  total cost of construction on the following components to a max ceiling of 2 units  per beneficiary.      
           
  HDPE VERMIBEDS    
           
50% assistance i.e. Rs.8000/-      
           
  INTEGRATED POST HARVEST MANAGEMENT    
           
Sl. Component Unit cost Pattern of Assistance    
No.    
1 Functional Pack house / on farm collection Unit Rs. 4.00 lakh/unit with size of 9Mx6M 50% of the capital cost.    
   
2 Integrated pack house with facilities for conveyer belt, sorting, grading units, washing, drying and weighing. Rs. 50.00 lakh per unit with size of 9Mx18M Credit linked back-ended subsidy @ 35% of the cost of project in general areas and 50% of cost in case Hilly & Scheduled areas for individual entrepreneurs    
   
3 Pre-cooling unit Rs. 25.00 lakh / unit with capacity of 6 MT. Credit linked back-ended subsidy @ 35% of the cost of project in general areas and 50% of cost in case Hilly & Scheduled areas for individual entrepreneurs    
   
4 Cold room (staging) Rs. 15.00 lakh/ unit of 30 MT capacity Credit linked back-ended subsidy @ 35% of the cost of project in general areas and 50% of cost in case Hilly & Scheduled areas    
   
5      
Cold Storage (Construction, Expansion and Modernization)    
     
  i)Cold storage units Type 1 - basic mezzanine structure with large chamber (of >250 MT) type with single temperature zone Rs. 8,000/MT, (max 5,000 MT capacity) Credit linked back-ended subsidy @ 35% of the cost of project in general areas and 50% of cost in case Hilly & Scheduled areas for individual entrepreneurs.    
  ii)Cold Storage Unit Type 2 – PEB structure for multiple temperature and product use, more than 6 chambers (of < Rs. 10,000/MT, (max 5,000 MT capacity) Credit linked back-ended subsidy @ 35% of the cost of project in general areas and 50% of cost in case Hilly & Scheduled areas for individual    
250 MT) and basic material handling equipment. entrepreneurs.    
  iii) Cold Storage Units Type 2 with add on technology for Controlled Atmosphere Additional Rs. 10,000/MT for add on components of controlled atmosphere technology. Details are in Appendix-II Credit linked back-ended subsidy @ 35% of the cost of project in general areas and 50% of cost in case Hilly & Scheduled areas for individual entrepreneurs.    
   
Sl. Component Unit cost Pattern of Assistance    
No.    
6 Refrigerated Transport vehicles Rs. 26.00 lakh for 9 MT (MIDH & HMNEH) Credit linked back-ended subsidy @ 35% of the cost of project in general areas and 50% of cost in case Hilly &    
Scheduled areas for individual entrepreneurs.    
7 Primary / Mobile/ Minimal processing unit Rs 25.00 lakh/unit      
Credit linked back-ended subsidy @ 40% of the capital cost of project in general areas and 55% in case of Hilly & Scheduled areas.    
     
8 Ripening chamber Rs. 1.00 lakh/MT.      
Credit linked back-ended subsidy @ 35% of the capital cost of project in general areas and 50% in case of Hilly & Scheduled areas for a maximum of 300 MT per beneficiary.    
     
9   Rs. 5.00 lakh/unit 50% of the total cost.    
Evaporative / low energy cool chamber (8 MT)    
     
10   Rs. 1.75 lakh/per unit 50% of the total cost.    
Low cost onion storage structure (25 MT)    
     

 

Contact us

State Horticulture Mission
Department of Horticulture
Public Garden, Nampally
Hyderabad, Telanagana
Pin: 500 004
Telefax: 040-23232253
email: shmcell.tg@gmail.com